crn 1s 19 a fgj a e hqqe 93395161 easing installation and improving operation DDA 30 4 FCM
Baker’s notes & crumb story
Description
crn 1s 19 a fgj a e hqqe 93395161 easing installation and improving operation DDA 30 4 FCM easing installation and improving operation The pump has R 2 discharge port and is ready for installation either free standing or on an auto coupling system Pipe connection is via combined DIN ANSI JIS flanges The pump is fitted with a 3 phase